GTY Compression Battery Lug Pin Type Cable Lugs

Specifications
|
Outer circle
|
Pipe wall thickness
|
Length
|
6
|
5.5
|
0.5
|
23.5
|
10
|
6.5
|
0.5
|
25
|
16
|
8
|
0.6
|
30
|
25
|
9
|
0.8
|
35
|
35
|
10.5
|
0.9
|
38.8
|
50
|
12.5
|
1.1
|
45
|
70
|
14.5
|
1.2
|
50
|
95
|
17
|
1.5
|
55.6
|
120
|
19
|
1.8
|
60
|
150
|
21
|
2
|
65.6
|
185
|
23
|
2
|
70
|
240
|
25
|
2.2
|
75.6
|
300
|
29
|
2.6
|
80.5
|
1. When cleaning the cold pressed wiring terminal, use silk cloth dipped in absolute ethanol and use it after drying. Acetone and other chemical solvents that may have harmful effects on the connector are not allowed.
2. The cold pressed terminal shall not be energized until it is properly connected or fully locked.
3. In the fixing of cold pressed terminal, clamping of harness and other occasions, there shall be anti loose devices (anti loose screws, anti loose rings, fuses, etc.) when using threaded connection.
Crimping inspection
1. Use appropriate cold pressed terminals according to the conductor section, and the corresponding specifications are required to be identical.
2. The length of stripped wire insulation layer shall meet the requirements and the length shall be correct.
3. All metal wires of the conductor shall be completely wrapped in the cold pressed terminal without scattered copper wires.
4. The crimping part shall meet the requirements and the crimping part shall be correct.
5. For the strength inspection after crimping, use the calibrated spring tension and compression tester to verify the crimping quality.
6. Inspection of crimping tools. The crimping tools must meet the requirements of fixing strength and be verified every three months. The tools that meet the requirements shall have labels indicating their validity period.
7. Wiring binding: at least once every 400 ~ 500mm during wiring binding.
Marine series copper terminals (JG Series), as the name suggests, marine series copper terminals are mainly used on various types of ships. It can support 6 to 300 mm2 wires for connection.
Installation precautions:
1. The screws must be tightened,
2. The cable and copper nose must be inserted in place and compressed with pliers.
The acceptance and inspection of cold pressed terminals shall be carried out according to the requirements of relevant product standards and operation instructions. The acceptance and inspection of used electrical connectors shall be carried out on the basis of relevant product standards and operation instructions, and the cold pressed terminals of tooling used shall be intact and qualified; The probe shall meet the standard requirements, otherwise it is easy to cause Jack damage.